Factory testing pumping systems accurately determines the efficiency
of the pump, motor, drive and control system - similar to kW/Ton for
chillers. Systecon's independently certified testing facility
offers performance tests which predict the transition points of multiply
pumps and guarantees the lowest possible kW for any pumping system.
Our testing procedure includes:
1. Each control system is tested in Systecon's engineering department
using a test cabinet. Standard sequences saved as blocks for future
reference guarantee proper and consistent operation for every system.
2. The Finished control cabinet with logic is installed on a water
management system in the factory and manually tested for wiring accuracy
to the pumps, motors, and drives. Manual low-stress tests are
performed on the equipment to keep startup damage virtually non-existent.
3. Full-flow, fully automatic testing is performed using Systecon's
30,000-gallon tank to verify all horsepower and kW readings, as well
as finding all WWE transition points. Accurate pressure drop readings
are taken to check for misalignment of pumps and piping, and to find
construction errors. All interfaces to chillers, towers, building
automation systems, and ancillary equipment are tested as much as possible
to minimize field commissioning.
4. The owner, an engineer, when present at the time of testing, may
request or implement design changes right at the factory. This truly
completes the customization process to give the owner everything possible
for total water management.
5. Systecon provides factory start-up personnel for every job to fine
tune the system once the field piping and devices are installed, and
perform any final adjustments required by field variances. Training is
also provided for maintenance issues and set point adjustments that
should last the life of the system. |
 |